StrongU STU U6 miner delay over 3 months

StrongU STU U6 miner delay over 3 months

Many people did not receive delivery notice in November 2019.

Scheduled delivery time : July 2019

Algorithm

X11

Coins

DASH

Rated Hashrate

660G±8%

Size

370*135*208mm

Consumption

1300W±10%

Net Weight

8.5kg

Cooling Method

2*12038 fans

Operating Temperature

0℃-40℃

Internet Connection

Ethernet

Noise

76dB

Warranty Period

6 months

Input Voltage

AC 220-240V,50/60Hz

Rated Power

1800W

Power Efficiency

93%

 

 

Be the first to reply

Leave a Reply

Your email address will not be published. Required fields are marked *